Construction Issue Drawings (GFC / IFC)
Field-ready documentation derived from coordinated digital intelligence. We provide high-accuracy GFC and IFC sets that eliminate field ambiguity.
The Problem
Poorly coordinated 2D drawings derived from disjointed sources lead to errors on site, conflicting installation instructions, and costly rework.
Our Solution
We extract all construction documentation directly from coordinated 3D BIM models. This ensures that every drawing—from plans and sections to complex details—is perfectly synchronized and constructible.
Technical Workflow
Model Sign-off
Documentation extraction begins only after the multi-discipline model has been fully coordinated and signed off.
Template & Standard Setup
We establish project-specific drawing templates and standards to ensure consistency and readability for site teams.
Automated extraction
We extract primary plans, sections, and elevations directly from the coordinated 3D environment.
Detailing & Annotation
Our engineers add necessary detailing, dimensions, and technical annotations, focusing on installation clarity.
Quality Assurance Review
Every drawing set undergoes rigorous review to ensure consistency with the model and compliance with local standards.
Deliverables
- Good for Construction (GFC) Sets
- Issued for Construction (IFC) Packages
- Detailed Shop Drawings
- Installation & Spool Sheets
- As-Built Record Drawings
- Schedules and Material Takeoffs
Standards Followed
- Local Building Authority Standards
- National CAD/BIM Standards
- Project Drawing Protocols
- Engineering Documentation Standards